You don't have javascript enabled. Good luck with that.
Pencarian
Infrastruktur Aliran Tengah Paling Siap Hadapi Banjir
.
photo Reza Hapiz - Beritajakarta.id

Middle Flow Infrastructures Ready to Face Flood

Head of Jakarta Water Management Department, Tri Djoko Sri Margianto mentioned, of the 3 flow systems in the capital, only the middle flow infrastructures which is the readiest for facing flood.

Condition of infrastruct ures that have been complete  built based on the master plan is  the middle flow

"Condition of infrastructures that have been complete  built based on the master plan is  the middle flow," he stated, at City Hall, Thursday (10/29).

He explained, the infrastructures built include Pluit Reservoir Pump, Siantar Pump, Melati Reservoir Pump and Setiabudi Pump.

Damaged Pumps in Kampung Apung Pump Station Repaired

"Those are the pumps prepared for flood handling," he explained.

According to him, flood handling on the middle flow system is getting stronger with the additional pump in Pasar Ikan. The next thing to do is evaluating the infrastructures.

"I will evaluate the result after flood. Whether the performance is appropriate or no. It could be not maximal," he uttered.

Besides infrastructures, he continued, the flow systems that have been built such as drainage, macro and micro channels will be monitored when raining. It aims to know which flow clogged and function not maximally due to various things.

"The first step prioritized now is dredging channels. As the systems we built would not be functioned if there is mud," he disclosed.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1039 personAldi Geri Lumban Tobing
  2. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye904 personFolmer
  3. Legislator Ahmad Lukman Jupiter Wants PT FSTJ Add Shop Cars

    access_time19-11-2024 remove_red_eye545 personDessy Suciati
  4. PMPTSP Agency Launches PIN Greenvest to Prompt Green and Sustainable Investment

    access_time21-11-2024 remove_red_eye447 personAldi Geri Lumban Tobing
  5. Transjakarta Extends its Operation to 11 PM Today

    access_time19-11-2024 remove_red_eye379 personAldi Geri Lumban Tobing