You don't have javascript enabled. Good luck with that.
Pencarian
Infrastruktur Aliran Tengah Paling Siap Hadapi Banjir

Middle Flow Infrastructures Ready to Face Flood

Head of Jakarta Water Management Department, Tri Djoko Sri Margianto mentioned, of the 3 flow systems in the capital, only the middle flow infrastructures which is the readiest for facing flood.

Condition of infrastruct ures that have been complete  built based on the master plan is  the middle flow

"Condition of infrastructures that have been complete  built based on the master plan is  the middle flow," he stated, at City Hall, Thursday (10/29).

He explained, the infrastructures built include Pluit Reservoir Pump, Siantar Pump, Melati Reservoir Pump and Setiabudi Pump.

Damaged Pumps in Kampung Apung Pump Station Repaired

"Those are the pumps prepared for flood handling," he explained.

According to him, flood handling on the middle flow system is getting stronger with the additional pump in Pasar Ikan. The next thing to do is evaluating the infrastructures.

"I will evaluate the result after flood. Whether the performance is appropriate or no. It could be not maximal," he uttered.

Besides infrastructures, he continued, the flow systems that have been built such as drainage, macro and micro channels will be monitored when raining. It aims to know which flow clogged and function not maximally due to various things.

"The first step prioritized now is dredging channels. As the systems we built would not be functioned if there is mud," he disclosed.

Linked News
Popular News indeks
  1. Pramono Flags Off 10,000 Runners at Soekarno Run 2026

    access_time15-02-2026 remove_red_eye1058 personFolmer
  2. Jakarta Unveils Indonesia’s First SDGs Corner at Maritime Museum

    access_time15-02-2026 remove_red_eye994 personNurito
  3. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye966 personAldi Geri Lumban Tobing
  4. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye927 personAldi Geri Lumban Tobing
  5. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye707 personAldi Geri Lumban Tobing